Total Pageviews

Saturday, December 10, 2011

ministry of water resources

Mulla Periyar Dam issue



1.         On 29-10-1886 a lease indenture for 999 years was made between Maharaja of Travancore and Secretary of State for India for Periyar irrigation works by another agreement in 1970, Tamil Nadu was permitted to generate power also.

2.         The Mullaperiyar Dam was constructed during 1887-1895 across Periyar River in the then Travancore state (now Kerala) territory after said indenture. The Periyar Dam with full reservoir level of 152 ft. provides for diversion of water from the reservoir through a tunnel to Vaigai basin in Tamil Nadu for irrigation benefits in 68558 ha. 

3          In 1979, reports appeared in Kerala Press about the safety of Mulla Periyar Dam.   On 25thNovember, 1979 Chairman, CWC held discussions at Thirvananthapuram regarding strengthening Periyar dam with officers of Irrigation and Electricity, Deptt. of Kerala and PWD of Tamil Nadu.  In the meeting, emergency measures to be completed before next monsoon (1980), medium term measures and long-term measures for strengthening of Periyar Dam were decided.  One of the emergency measures was to keep the shutters of spillway raised fully to lower the reservoir level to 136 ft. 

4.         A second meeting under the Chairmanship of Chairman, CWC was held on 29th April 1980 at New Delhi and it was opined that after the completion of emergency and medium term measures in the form of cable anchoring, the water level in the reservoir can be restored up to 145 ft.

5.         As per the Memorandum on the Rehabilitation of Mulla Periyar Dam prepared by CWC and forwarded to Tamil Nadu on 25th March, 1986, emergency measures were implemented.  In the aforesaid Memo, CWC gave its recommendation about peak flood and size of additional vents to be added in the spillway for implementing remaining emergency measure of providing additional spilling capacity.  It also gave its recommendation about the design details of concrete backing on the downstream face of the dam.  Besides this, CWC suggested The Government of Tamil Nadu to examine the possibility of raising the top of RCC parapet by another two feet apart from few other suggestions.             It was opined in the forwarding note that after completion of the proposed strengthening measures, provision of other additional vents and implementation of other suggestions, Periyar dam would be competent to hold water upto FRL of 152 ft.

6.         The matter became subjudice with several petitions in the Kerala and Tamil Nadu High Courts. All these cases were transferred to the Supreme Court which heard the matter and desired in its order dated 28.4.2000 that Hon’ble Minister (WR) may convene a meeting of the Chief Ministers of both the states of Kerala and Tamil Nadu to amicably resolve the issue.  .

7.        Hon’ble Minister (WR) convened the Inter-State meeting on 19.5.2000 and as decided in the meeting, an Expert Committee under Member (D&R), CWC with representatives from both States was constituted in June 2000 to study the safety of the dam with respect to strengthening of dam carried out by The Government of Tamil Nadu on the advice of Central Water Commission and advise regarding raising of water level in the reservoir beyond 136 ft as a result of strengthening of dam.

8.     The Committee in its report of March, 2001 opined that with the strengthening measures implemented, the water level can be raised from 136 ft. to 142 ft. without endangering safety of the dam. Further raising of water level to 152 ft. will be considered after balance strengthening measures are implemented.

9.                  In the case of Transfer Petition (Civil) No. 779-783/1998 Dr. Subramanian Swamy Vs Tamil Nadu, the Report of the Expert Committee was filed in the Hon’ble Supreme Court on 31.8.2001 and also sent to the State Governments of Kerala and Tamil Nadu. 

10        In writ Petition ( C) No. 386 of 2001 (Mulla Periyar Environmental Protection Forum Vs Union of India and Ors) the Supreme Court in its Judgement dated 27.2.2006, permitted the Government of Tamil Nadu to raise the water level of Mulla Periyar dam from 136 ft. to 142 ft. and take up  the remaining strengthening measures.

11.      Consequent to the aforesaid orders of the Supreme Court of India, the Kerala Government passed the Kerala Irrigation and Water Conservation (Amendment) Act 2006 which received the assent of the Governor   on 18th March 2006 which prohibited the raising of water level beyond 136 ft. in the Mulla Periyar Dam as Mullaperiyar Dam was placed under the Schedule of ‘Endangered Dams’.

12.     The Government of Tamil Nadu filed a suit No. 3 of 2006 - State of Tamil Nadu v/s State of Kerala and Union of India in the Hon’ble Supreme Court on 31.3.2006 praying for -

(i)                 Declaration of Kerala Irrigation and Water Conservation (Amendment) Act 2006 passed by Kerala Legislature as unconstitutional in its application to and effect on Mulla Periyar Dam.
(ii)               Pass a decree of permanent injunction restraining Kerala from application and enforcing impunged legislation enforcing with or obstructing Tamil Nadu from increasing the water level to 142 feet and from carrying out the repair works as per judgment of Supreme Court dated 27th February 2006.

13.      A Review Petition filed by the State of Kerala on 3.4.2006 was dismissed by the Supreme Court on 27.7.2006. 

14.      In the matter referred to in para 13 above, the Hon’ble Supreme Court has passed an order on 25.9.2006 stating “the two State Governments independently or with the intervention of the Union of India may try to sort out the dispute, if possible.

15.      The Hon’ble Union Minister (WR) convened an inter-State meeting of the Chief Ministers of States of Tamil Nadu & Kerala on Mulla periyar dam issue on 29.11.2006 at New Delhi.  Hon’ble Union Minister (WR) further discussed matter with the Minister (WR/PW) from the States of Tamil Nadu & Kerala on18.12.2006.  The States of Tamil Nadu and Kerala reiterated their respective stand in the meetings and no consensus could be reached regarding a solution acceptable to both States. The matter is now subjudice.

16.              Subsequently, Hon’ble Chief Minister of Tamil Nadu met Hon’ble Prime Minister on 18.12.2007 and Hon’ble Prime Minister suggested him to have a meeting with Hon’ble Chief Minister of Kerala on Mulla Periyar issue.  Hon’ble Chief Minister of Tamil Nadu met Hon’ble Chief Minister of Kerala on 19.12.2007 in presence of Hon’ble Union Minister of Water Resources.  Further a letter dated 20.12.2007  was  received from the Hon’ble Chief Minister of Tamil Nadu  mentioning that in the above meeting, Hon’ble Chief Minister of Tamil Nadu suggested to oversee the seepage measurement of the dam by engineers not belonging to either of the two States through CWC and Hon’ble Chief Minister of Kerala  agreed to consider them.

17.       Later, the Govt. of Tamil Nadu forwarded a letter dt 22/1/08 of Hon’ble Chief Minister of Kerala addressed to Hon’ble Chief Minister of Tamil Nadu wherein it is mentioned that in the meeting dt 19/12/2007 he suggested a joint mechanism to monitor the seepage. The Govt. of Tamil Nadu also enclosed a letter dated 4/2/2008 from Hon’ble Chief Minister of Tamil Nadu addressed to Hon’ble Chief Minister of Kerala wherein it is mentioned that joint monitoring was not discussed in the meeting.

18.     CWC was requested to suggest a suitable mechanism for monitoring the seepage and possible structure of the Committee to monitor it. They suggested a nine- member Committee headed by a Chief Engineer, Central Water Commission having representatives from both States for Monitoring the seepage of Mulla Periyar Dam.   The composition of the Committee along with terms of reference was sent to Chief Secretary,  Government of Tamil Nadu and Kerala vide letter dated 28.4.2008 for  their concurrence / suggestions.

19.       The Government of Tamil Nadu vide its letter dated 17.6.2008 has sent its comments on the proposed Monitoring Committee stating that the present proposal of the Government of India to constitute a Committee comprising officers from CWC, Tamil Nadu Government and Kerala Government to measure the seepage in Mulla Periyar Dam is not in conformity with the discussion held in the meeting dated 19.12.2007 and proposal will lead to more and more complications and thus not acceptable to Govt. of Tamil Nadu. The Govt. of Kerala vide letter dt 24.2.2009 informed that the stand taken by the Govt. of Tamil Nadu for  neutral agency of experts excluding those form Kerala and Tamil Nadu is not acceptable to them.

20.      In the meanwhile, Govt. of Kerala has got done hydrological review studies from a professor of IIT, Delhi and has since filed the said hydrological studies report in the Hon’ble Supreme Court on 15.07.08 in connection with Suit No.3 of 2006 filed by the Government of Tamil Nadu. It has been concluded in the report that the Mulla Periyar dam is hydrologic ally unsafe for passing the estimated Probable Maximum Flood (2, 91,275 cusec / 8,248 cusec) with the existing spillway capacity. Comments of Hydrological Studies Organisation, CWC on the report were forwarded to the Govt. Advocate as per instructions of MoWR vide CWC letter dated 13.10.08. CWC has commented that the difference in the adopted values of Design Rainfall (Storm) depth, Time distribution of rainfall, Unit hydrograph & Infiltration rate have resulted in estimation of higher flood peak (PMF) and the said studies by the IIT Professor  does  not appear to be well founded.

21.      Meanwhile the Government of Kerala constituted a Committee in May 2009 which submitted its report in June, 2009. The Committee suggested mapping of the underwater area, installation of highly sensitive computer operated Seismograph and construction of a new Dam downstream of existing dam. The Committee has also opined that the dam has reached such a deteriorated condition that no amount of rectification work could salvage it to a safe and healthy condition.  Keeping in view this report, Minister (WR) advised Chairman, CWC in July, 2009 to constitute a team of officers to visit the dam and assess the present condition of the Mulla Periyar dam and look into the issues raised in the report of the above Expert Committee. The team had proposed a visit to the dam from 22-25 July, 2009 and the conveniences of the Government of Kerala and Tamil Nadu for the visit were sought. The Government of Tamil Nadu agreed to the proposed visit but the Government of Kerala requested for postponement of the proposed visit because of torrential rains. Thereafter, the visit could not materialize.

22.        Thereafter, Secretary (WR) convened a meeting on the Mulla Periyar Dam on 31.7.2009. The meeting was attended among others by Principal Secretary, PWD, Tamil Nadu and Additional Chief Secretary, WRD, Kerala. In the meeting the representative of Kerala informed that the Kerala Govt. visualizes construction of new dam as the only feasible solution and they have started survey and investigation for a new dam at an alternate site downstream of the existing dam and they may also consider the construction of a new dam at their own cost. Representative of Kerala stated in the meeting that the Govt. of Kerala also recognizes the established uses of water from the dam by Tamil Nadu as per the existing agreement between the two States and will continue the same after the construction of a new dam. In the said meeting the representative of Govt. of Tamil Nadu informed that the Govt. of Tamil Nadu would examine the proposal of the Govt. of Kerala for new Dam after the same is formally received from them. In view of this, Hon’ble Minister (WR) vide DO dated 26.08.2009 requested Hon’ble Chief Minister, Kerala to send the proposal in this regard to the Govt. of Tamil Nadu for their consideration.

23.       Later, Govt. of Tamil Nadu vide letter dated 14.9.09 mentioned that as regards the decision that has emerged in the meeting, to examine the proposal of the Kerala Government for the construction of a new dam by Tamil Nadu Government, the Government of Tamil Nadu had already communicated to the Government of India as well as to the Government of Kerala that there is no need for construction of a new dam by the Kerala Government, as the existing dam after it is strengthened, functions like a new dam. They also  mentioned that Hon’ble Chief Minister of Tamil Nadu in his letter dated 13.07.09 to  Hon’ble Chief Minister of Kerala had mentioned that Kerala Govt. may not raise the issue of new dam any more.
           
24.       The Govt. of Kerala vide letter dated 26.9.2009 sent comments on the minutes of the meeting dated 31.7.2009 mentioning that the statement “The Govt. of Kerala also recognizes the established use of water from the dam by the Tamil Nadu as per the existing agreement between the two States and continue the same after the construction of new dam” is not acceptable.  What was mentioned in the meeting was that Kerala is willing to give water to Tamil Nadu.
                                                                                        
25.   Further, Hon’ble Supreme Court heard the issues related to Mulla Periyar Dam on 10.11.2009 and passed the order that,
“As the case involves the resolution of said questions, the suit may be placed before the Hon’ble Chief Justice of India for necessary directions for placing it before a constitution Bench.
                                                         
The contesting parties shall maintain status quo in respect of Mulla Periyar Dam as existing today.  However, order of status quo will not be an impediment for the plaintiff (State of Tamil Nadu) to carry out maintenance and repairs for proper upkeep of the said Dam.”


26.        The case was heard by five judges on 18.2.2010 and the Court directed Central Govt. to constitute an empowered Committee in this regard which would hear the parties to the suit on all issues that will be  raised before them, and furnish a report, as far as possible, with in six months from their constitution. 

27        Following the order of Hon’ble Supreme Court dated 29.02.2010, Centre (MoWR) has constituted an Empowered Committee vide Notification dated the 30th April, 2010.   The Committee started its functioning and was to submit its report within six months period.  Further, Supreme Court vide its order dated 20th September, 2010 has extended the term of Committee by a further period of six months.  Therefore, implementing the said directions of the Supreme Court, the Central Government extends, the terms of Empowered Committee for a further period of six months w.e.f. 30th October, 2010 vide Notification dated the 28th October, 2010.


The Vaigai  is a river in Madurai, Tamil Nadu state of southern India. It originates in the Periyar Plateau of the Western Ghats range, and flows northeast through the Kambam Valley, which lies between the Palni Hills to the north and the Varushanad Hills to the south. The Vattaparai Fallsare located on this river. As it rounds the eastern corner of the Varushanad Hills, the river turns southeast, running through the region of Pandya Nadu. Madurai, the largest city in the Pandya Nadu region and its ancient capital, lies on the Vaigai. The river empties into the Palk Strait inRamanathapuram District.
The Vaigai is 258 kilometres (160 mi) long, with a drainage basin 7,031 square kilometres (2,715 sq mi) large.[2]


The following story is told about the birth of the river Vaigai. Meenakshi, the daughter of a Pandyan king, was an incarnation of Parvati. From a very young age, she made up her mind to marry Lord Shiva and none else. Her family was initially against this but eventually consented to her wish and arranged the wedding. Sundareswara (Siva), being an ascetic, came to the wedding without any family or relatives accompanying him. Disappointed at this, the Pandyan king angrily showed Siva the huge amount of food prepared for the bridegroom's relatives. Siva pointed to a friend he had brought with him saying 'He will consume all the food that you've made'. This friend was a Rakshasa named Kundodhara. After Kundodhara finished all the food that was prepared, He became very thirsty and started asking for water. All the wells and canals in Madurai were not sufficient to quench his thirst. Then, Siva asked Kundodhara to put his hand out and opened a small part of his hair lock and Ganga began to flow into his hand. After quenching his thirst, The rest of the waters began flowing in Madurai as the Vaigai river. Vaigai means 'put your hand out' in Tamil.
Etymology and History


Tributaries

The main tributaries of the river Vaigai are, the river Suruliyaru, the river Mullaiyaaru, the river Varaganadi, the river Manajalaru and river Kridhumaal. All these rivers, except Kridhumaal join with the great Vaigai river nearer to the places around the Vaigai Dam which is situated in Theni district, whereas Kridhumaal joins Vaigai in Madurai.
Vaigai gets major feed from the Periyar Dam in Kumuli, Kerala. Water from the Periyar River in Kerala is diverted into the Vaigai River in Tamil Nadu via a tunnel through the Western Ghats. As the Kerala government is refusing to increase the storage level of Mullaperiyar Dam, due to dam-safety concerns, Vaigai river ends up dry very often. The water never reaches Madurai, let alone flowing into places past Madurai.


Dams

The Periyar Dam was built in 1895 by John Pennycuick, who implemented a plan proposed over a century earlier by Pradani Muthirulappa Pillai of Ramnad. The dam was built by the British Army Engineering corps for the Travancore kingdom. The first dam was washed away by floods, and a second masonry dam was constructed in 1895.
"Greater than the mother bearing child/Greater than the child that is born/Every breath is Periyar/Every word is Periyar/In every place, in all the world/As far as Periyar water flows/Your name will stand-Pennycuick-your name/Though written on water, will always stand".
That is how Anthony Muthu Pillai (1863-1929) had paid tributes in Tamil to John Pennycuick, the engineer who had taken up the "audacious and unprecedented feat of...engineering" for transferring some water from the Periyar river in Travancore State to the Vaigai basin in Madras Presidency. This basin was described by Poet and lyricist Vairamuthu, who hails from this area: "It is a different world. Another planet on the surface of the earth. Ignored by the clouds, cursed by nature and dry land, passed by the Gods with their eyes tightly shut..."

Periyar (பெரியாறு/Malayalam: പെരിയാര്‍ meaning: big river) is the longest river in the state of Kerala, India, with a length of 244 km. The Periyar is known as the lifeline of Kerala; it is one of the few perennial rivers in the region and provides drinking water for several major towns.The Idukki Dam on the Periyar generates a significant proportion of Kerala's electrical power


[edit]
Origin and Path

Periyar river view at Bhoothathankettu near Kothamangalam, Ernakulam.
Periyar originates in the Sivagiri hills of the Western Ghats range at the border of Tamilnadu and Kerala. It flows northwards for 48 kms and at Thekkady joins the west-flowing Mullayar, also originating in the Western Ghats in Kerala. The Mullaperiyar dam is constructed at the confluence of both the rivers Periyar and Mullayar to create the Periyar lake and reservoir and the Periyar National Park.
From Periyar Thekkady lake and reservoir, water is diverted eastwards to Tamilnadu via a tunnel enabling the water to join the Vaigai River. From Periyar Thekkady Reservoir, the Periyar river flows northwestward for 35 kms through Vandiperiyar, Elappara and Aiyyappankoil to join the Idukki reservoir formed by the Idukki, Cheruthoni and Kulamavu dams. From Idukki reservoir, Periyar river flows northwestwards and then westward to join the Arabian sea at Munambam near Kodungallur and the Vembanad lake at Kochi.

[edit]Tributaries

Its major tributaries are:
  • Muthirapuzha River
  • Mullayar River
  • Cheruthoni River
  • Perinjankutti River
  • Edamala River
Minor tributaries are: Muthayar, Perunthuraiar, Chinnar, Cheruthony, Kattappanayar

[edit]Hydro electric projects

The largest hydro- electric project of the state, namely Idukki with its arch dam is on this river. Pallivasal, Chenkulam, Panniyar, Neriyamangalam and Lower Periyar are the other hydro electric projects on river Periyar.

[edit]Dams

Mullaperiyar, Bhuthathankettu, Mattupetty, Munnar, Idukki,Cheruthoni, Kulamavu, Irattayar, Lower Periyar, Edamalayar, Chenkulam, Anayirangal and Ponmudi are the important dams across this river.
At Aluva, the river bifurcates into the Marthandavarma and the Mangalapuzha branches. The Mangalapuzha branch joins Chalakkudy river and empties into the Lakshadweep sea at Munambam, and the Marthandavarma branch flows southwards, through the Udhyogamandal area and joins the Cochin backwater system (part of Vembanad Lake) at Varapuzha.

[edit]The Idukki Dam

Idukki Dam across the Periyar river
The Idukki Dam on the Periyar is the biggest dam of its kind (a concrete, double curvature parabolic, thin arc dam) in Asia and the second biggest in the world. Its generators have a power output of 780 MW (6 X 130), and generate electricity through the underground Power House facility at Moolamattam, built by an India-Canada Joint Venture. Power generation at Idukki is minimal during the monsoon. The dam also permits storage of water for the dry summer period when many other reservoirs in the area are low.

[edit]Pollution

The lower reaches of the Periyar are heavily polluted. Industries in the Eloor industrial zone discharge waste into the river. Greenpeace India describes the lower Periyar as "a cesspool of toxins, which have alarming levels of deadly poisons like DDT, endosulfan, hexa and trivalent chromium, lead,cyanide, BHC."

John Pennycuick (British engineer)

From Wikipedia, the free encyclopedia
Colonel John Pennycuick CSI (January 15, 1841, Pune - March 9, 1911, Camberley) was a British Army engineer and civil servant who served as a member of the Madras Legislative Council. He undertook several irrigation works which included the masonry dam of Mullaperiyar on the Periyar River.
Pennycuick was born on January 15, 1841 to Brigadier-General John Pennycuick who fought and died in the Battle of Chillianwalla. Pennycuick was educated at Cheltanham and Addiscombe and was appointed lieutenant in the Madras Engineers in December 1858.[edit]

Early life

[edit]Career

Pennycuick trained at the Military College in Addiscombe and joined the Royal Engineers in 1858  and arrived in India on November 11, 1860. He became a Second Captain on 15th October 1870. Captain John Pennycuick made a major on 8 December, 1876.He commanded H company at Zoulla during the Abyssinian campaign of 1868. On October 10, 1895 the Queen nominated him a Companion of the Most Exalted Order of the Star of India. He served in Public Works Department till January 1896. During his six years of service in the PWD , Pennycuick served as Chief Engineer in the construction of the Mullaperiyar Dam and was awarded a medal for his participation in Abyssinian Expedition of 1867-68. Pennycuick was nominated to the Madras Legislative Council in November 1893. He was the last president of the Royal Indian Engineering College at Coopers Hill. He also held the position of President of the Sanitary Board and was a faculty in the University of Madras. He received a Telford medal from the Institution of Civil Engineers. The Australian government sought his advise for avoiding damage from flooding of the Brisbane river in 1899. He was also a keen cricketer.

[edit]Remembrance in Tamilnadu

  • Tamilnadu government established his statue.
  • Still, many of the farmer families of the Theni, Madurai District have been keeping the portraits of John Pennycuick.
  • In the remembrance of him, many children in this area are named after him.
  • In Theni district,at Balarpatti and Kuzhiyanur, people celebrate the Pongal in the streets.

Mullaperiyar Dam is a masonry gravity dam on the Periyar River.] It is located 881 m (2,890 ft) above mean sea level on the Cardamom Hills of the Western Ghats in Thekkady,Idukki District of Kerala, South India. It was constructed between 1887 and 1895 by the British Government to divert water eastwards to Madras Presidency area (the present-day Tamil Nadu). It has a height of 53.6 m (176 ft) from the foundation and length of 365.7 m (1,200 ft). The Periyar National Park in Thekkady is located around the dam's reservoir. The dam and the river are owned by and located in Kerala  but the dam is controlled and operated under a period lease by neigboring Tamil Nadu state. The safety of the dam has been a matter of concern and a point of dispute between Kerala and Tamil Nadu states.


Earlier known as the Periyar dam as it was basically meant to dam the Periyar river,
 the present name Mullaperiyar is derived from a portmanteau of Mullayar River and Periyar River, at the confluence of which the dam is located below.Etymology

Purpose


68,558 ha (264.70 sq mi) Irrigated Area
The Periyar river which flows westward into the Arabian Sea was diverted eastward to flow towards the Bay of Bengal and provide water to the arid rain shadow region of Madurai in Madras Presidency which was in dire need of a greater supply than the small Vaigai River could give. The dam created the Periyar Thekkady reservoir, from which water was diverted eastwards to via a tunnel to augment the small flow of the Vaigai River. The Vaigai was dammed by the Vaigai Dam to provide a source for irrigating large tracts around Madurai. Initially the dam waters were used only for irrigation. Later, the Periyar Power Station in the lower Periyar, Tamil Nadu was built which generates hydro-electricity from the diverted waters.

Design

The Mullaperiyar Dam is a gravity dam made with limestone and surkhi (a mixture of crushed brick, sugar and quicklime). Gravity dams use their weight and the force of gravity to support the reservoir and remain stable. The main dam has a maximum height of 53.6 m (176 ft) and length of 365.7 m (1,200 ft). Its crest is 3.6 m (12 ft) wide while the base has a width of 42.2 m (138 ft). It consists of a main dam, spillway on its left and an auxiliary dam (or "baby dam") to the right. Its reservoir can withhold 443,230,000 m3 (359,332 acre·ft) of water, of which 299,130,000 m3 (242,509 acre·ft) is active (live) storage.

Layout of Mullaperiyar dam.

History

Feasability studies

The unique idea of harnessing the westward flowing water of the Periyar river and diverting it to the eastward flowing Vagai river was first explored in 1789 by Pradani Muthirulappa Pillai, a minister of the Ramnad king Muthuramalinga Sethupathy, who gave it up as he found it to be expensive. The location of the dam had first been scouted by Captain J. L. Caldwell, Madras Engineers (abbreviated as M.E.) in 1808 to reconnoitre the feasibility of providing water from the Periyar river to Madurai by a tunnel through the mountains. Caldwell discovered that the excavation needed would be in excess of 100 feet in depth and the project was abandoned with the comment in his report as "decidedly chimerical and unworthy of any further regard".
The first attempt at damming the Periyar with an earthen dam in 1850 was given up due to demands for higher wages by the labour citing unhealthy living conditions. The proposal was resubmitted a number of times and in 1862, Captain J. G. Ryves, M.E., carried out a study and submitted proposals in 1867 for another earthwork dam, 62 feet high. The matter was debated by the Madras Government and the matter further delayed by the terrible famine of 1876-77. Finally, in 1882, the construction of the dam was approved and Major John Pennycuick, M.E., placed in charge to prepare a revised project and estimate which was approved in 1884 by his superiors.

Lease

On 29 October 1886, a lease indenture for 999 years was made between the Maharaja of Travancore, Visakham Thirunal Rama Varma and the Bitish Secretary of State for India for Periyar Irrigation Works. The lease agreement was signed by Dewan of Travancore V Ram Iyengar and State Secretary of Madras State J C Hannington. This lease was made after 24 years negotiation between the Maharaja and the British. The lease indenture granted full right, power and liberty the Secretary of State for India to construct make and carry out on the leased land and to use exclusively when constructed, made and carried out, all such irrigation works and other works ancillary thereto to. The agreement gave 8000 acres of land for the reservoir and another 100 acres to construct the dam. The tax for each acre was INR 5 per year. The lease provided the British the rights over "all the waters" of the Mullaperiyar and its catchment basin, for an annual rent of INR 40,000.
In 1947, after Indian Independance, the lease agreement expired. After several failed attempts to renew the agreement in 1958, 1960, and 1969, the agreement was renewed in 1970 when C Achutha Menon was Kerala Chief Minister. According to the renewed agreement, the tax per acre was increased to INR 30, and for the electricity generated in Lower Camp using Mullaperiyar water, the charge was INR 12 per kiloWatt per hour. Tamil Nadu uses the water and the land, and the Tamil Nadu government has been paying to the Kerala government for the past 50 years INR 2.5 lakhs as tax per year for the whole land and INR 7.5 lakhs per year as surcharge for the total amount of electricity generated.The validity of this agreement is under dispute between the States of Kerala and Tamil Nadu. The matter is currently pending before a Division Bench of the Supreme Court.

Construction


Cross-section of the dam.
In May 1887, construction of the dam began. As per "The Military Engineer in India" Vol II by Sandes (1935), the dam was constructed from lime stone and surkhi (burnt brick powder and a mixture of sugar and calcium oxide, one of the archaic construction techniques of 19th century)  at a cost of INR 104 lakhs, was 173 feet high and 1241 feet in length along the top and enclosed more than 15 thousand million cubic feet of water. Another source states that the dam was constructed of concrete (no real evidence or reference for this) and gives a figure of 152 feet height of the full water level of the reservoir, with impounding capacity of 10.56 thousand million cubic feet along-with a total estimated cost of INR 84.71 lak.
The construction involved the use of troops from the 1st and 4th battalions of theMadras Pioneers as well as Portuguese carpenters from Cochin who were employed in the construction of the coffer-dams and other structures. The greatest challenge was the diversion of the river so that lower portions of the great dam could be built. The temporary embankments and coffer-dams used to restrain the river waters were regularly swept away by floods and rains. Due to the coffer dam failures, the British stopped funding the project. Officer Pennycuick raised funds by selling his wife's jewelry to continue the work. In Madurai, Major Pennycuick's statue has been installed at the state PWD office and his photographs are found adorning walls in peoples homes and shops. In 2002, his great grandson was honoured in Madurai, a function that was attended by thousands of people.
The dam created a reservoir in a remote gorge of the Periyar river situated 3,000 feet above the sea in dense and malarial jungle, and from the northerly arm of this manmade waterbody, the water flowed first through a deep cutting for about a mile and then through a tunnel, 5704 feet in length and later through another cutting on the other side of the watershed and into a natural ravine and so onto the Vaigai River which has been partly built up for a length of 86 miles, finally discharging 2000 cusecs of water for the arid rain shadow regions of present-day Theni, Madurai District, Sivaganga District and Ramanathapuram districts of Tamil Nadu, then under British rule as part of Madras Province (Sandes, 1935).
The Periyar project, as it was then known, was widely considered well into the 20th Century as "one of the most extraordinary feats of engineering ever performed by man". A large amount of manual labour was involved and worker mortality from malaria was high. It was claimed that had it not been for "the medicinal effects of the native spirit called arrack, the dam might never have been finished". 483 people died of diseases during the construction of this dam and were buried on-site in a cemetery just north of the dam.

Protected area


Periyar National Park
The Periyar National Park in Thekkady, a Protected area of Kerala, is located around the dam's reservoir, the 26 km2 (10 sq mi) Periyar lake. 62 different kinds of mammals have been recorded in Periyar, including many threatened ones. Periyar is a highly protected tiger reserve and elephant reserve. There are an estimated 53 tigers (2010) in the reserve. Tourists come here to view theIndian elephants in their natural habitat. The elephant number around 900 to 1000 individuals. Other mammals found here include gaur, Bison, sambar (horse deer), barking deer, mouse deer,Dholes (Indian wild dogs), mongoose, foxesand leopards. Also inhabiting the park, though rarely seen, are the elusive Nilgiri tahr. Four species of primates are found at Periyar - the rare lion-tailed macaque, the Nilgiri Langur, the commonlangur, and the Bonnet Macaque. According to a report by the Kerala Forest Research Institute, the protected area surrounding the dam and reservoir is classified as a biodiversity hot spot.